HYDRUS EngineeringMeet Us

Project References

Selected projects HYDRUS Group has delivered for clients across maritime, energy and defence.

LPG
LPG Tanker Dry Dock Supervision & Technical Management

Full-scope Dry Dock Project Management executed by HYDRUS acting as Owners' representative throughout the docking period.

MaritimeOwners' Representative
FER
Ferry55 — Open-Type Double-End RoPax Production Design

Comprehensive 3D Production Model for a ~55 m Open-Type Double-End RoPax Ferry — structural, piping and steel outfitting design integrated for shipyard fabrication.

MaritimeProduction Design Lead
PRO
ProTUG65 — Harbor Tug Feasibility & Concept Design

Feasibility assessment and concept design of a ~32.4 m harbor tug under RINA classification — preliminary naval architecture through hydrodynamic performance analysis.

MaritimeConcept Designer
VLC
VLCC Cargo Heating Coil Retrofit

Large-scale retrofit installation of heating coils across the Cargo Oil Tanks of a VLCC tanker — over 20 km of new piping plus a new atmospheric condenser cooling system.

MaritimeEngineering Lead
FSO
FSO Conversion — 20-Year-Old Suezmax to Floating Storage & Offloading

Conversion of a 20-year-old Suezmax tanker to a Floating Storage and Offloading (FSO) vessel for offshore deployment.

MaritimeConversion Engineering
LNG
LNG Bunker Vessel — Bow Loading Manifolds Installation

Forward LNG bunkering upgrade designed to extend a 7,500 m³ LNG Bunker vessel's operational reach and serve a wider range of LNG-fuelled vessels.

MaritimeConcept & Integration Engineer
MOD
Model Test Re-evaluation — Low-Friction Coating Benefits

Re-evaluation of existing model test results to quantify the performance benefits of low-friction hull coatings — for RightShip and EEXI compliance.

MaritimeTechnical Advisor
ENC
Enclosed Space Compliance App

HYDRUS in-house software product — the complete all-in-one solution for enclosed space safety, risk and compliance under IMO MSC.581(110) and RightShip RISQ 3.2.

MaritimeHYDRUS Product
MOD
Modular Lifting Dock Jig Design

Modular lifting dock jig capable of supporting vessels with a distributed load of 35 t/m or up to 280 t per jig.

MaritimeConcept & Detail Designer
TAN
Tanker Projects

An overview of HYDRUS experience and involvement in tanker new building projects supporting the global energy transportation sector.

Maritime12 supervision / 11 plan approval
SPE
Specialized Projects

An overview of HYDRUS experience and involvement in specialized new building projects requiring tailored technical and operational solutions.

Maritime2 designs under dev. + 1 supervision
GAS
Gas Carrier Projects

An overview of HYDRUS experience and involvement in gas carrier new building projects focused on LNG and LPG transportation.

Maritime2 supervision / 3 plan approval
CON
Container Carrier Projects

An overview of HYDRUS experience and involvement in container carrier new building projects supporting global trade and logistics networks.

Maritime9 supervision / 2 plan approval
BUL
Bulk Carrier Projects

An overview of HYDRUS experience and involvement in bulk carrier new building projects supporting the transportation of global dry commodities.

Maritime11 supervision / 3 plan approval
4× 57k DWT Bulk Carriers — BWTS Afloat Turnkey Project

Successfully executed turnkey BWTS retrofit projects onboard four 57k DWT bulk carriers under afloat installation conditions. HYDRUS managed the full project lifecycle, from pre-engineering attendance and onboarding inspections to commissioning and classification verification — ensuring timely execution with minimum operational disruption.

MaritimeFull Project Lifecycle Management
SHA
Shaft Generator Retrofit — Capesize Bulk Carrier

HYDRUS undertook the entire study for the shaft generator retrofit in a Capesize bulk carrier — coordinating equipment maker and Classification Society, preparing the shipyard's retrofit specification, managing procurement of Owners' supply items, and supervising the works onsite up to sea trials.

MaritimeStudy · Procurement · Supervision
HS
HS HERCULES — Stability Re-creation & Submarine Rescue System Integration

Specialised naval engineering studies and retrofit support enhancing vessel survivability, operational readiness, and mission capabilities.

DefenceNaval Engineering Lead
HS-
HS-SOSS PERSEAS — Accommodation Expansion & Conversion Feasibility

Comprehensive feasibility study to expand accommodation from 70 to 235 personnel and integrate small-craft launch/recovery systems on the Hellenic Navy support vessel (A377).

DefenceFeasibility & Concept Lead
MEK
MEKO MLU — Frigate Mid-Life Upgrade

Mid-Life Upgrade modernisation programme extending the operational life of MEKO 200 frigates by 15–20 years.

DefenceTechnical Contributor
EUR
European Patrol Corvette (EPC)

Collaborative European defence initiative to design and develop a modular, flexible, multi-purpose naval vessel.

DefenceHellenic Navy Technical Contributor
NUC
Nuclear — Electrical & Auxiliary Systems Integration

Integration of electrical and auxiliary systems inside nuclear plant buildings — specialised electrical and BIM engineering for nuclear infrastructure.

EnergySpecialised Engineering Partner
Back to Home
Posidonia 2026